Drilling time
Time is travel divided by feed rate. Travel is the hole depth plus the drill point length, D/2 ÷ tan(angle/2), plus the approach. Example with sample values, not recommendations: a Ø8.5 drill with a 140° point at 3,000 RPM and f 0.15 mm/rev gives F 450 mm/min; a 25 mm hole with 2 mm approach is 28.5 mm of travel, about 3.8 seconds.
Tapping time
A tap advances one pitch per revolution: F = pitch × RPM. The time is the travel in plus the way out, often at a higher speed. Example with sample values: M10 with 1.5 pitch at 500 RPM gives F 750 mm/min; 20 mm of thread plus 2 mm approach, in and out at the same speed, takes about 3.5 seconds.
What is not included
The calculation counts feed time only. Rapids, tool changes, peck retracts and loading time come on top: for a quote, the real time is always a little longer.
Where Vc and f come from
Always from the drill or tap manufacturer's catalogue, for that material. Toolhelix only does the maths: it does not suggest cutting data.